Skip to content

Maker plans and limits

All plans Anyone can build and publish; Owner or Admin to buy credits

Onplana Maker (describe an app, have the AI build it, then publish it to a live URL) is available on every plan. This page is the single reference for its limits. The detailed guides for building and publishing explain each one in depth.

LimitFreeStarterProBusinessEnterpriseEnterprise+
Build (chat-to-build)Credits, up to 7/dayCreditsCreditsCreditsCreditsUnlimited
Published apps (live at once)131025100Unlimited
Max size per published app30 MB75 MB500 MB1 GBUnlimitedUnlimited
Publishes per day515100400UnlimitedUnlimited
  • Building is on every plan. A completed build costs 1 build credit; $5 buys 10 builds. A build that fails to compile is free.
  • Every build draws from your included AI credit (your plan’s one-time bonus plus any top-ups). The Free plan is additionally capped at 7 builds a day; paid plans have no daily cap.
  • The optional “make it better” pass uses a more powerful model and costs 10 credits.
  • Build credits and your AI chat allowance are the same prepaid balance, so a top-up stretches across both.
  • If you run out, Onplana stops you before any work starts. There is never a surprise charge; you buy more credit or upgrade your plan.

Full detail: Build credits and your build budget.

  • Each plan can keep a set number of apps published at once (the table above). Building and code export are not capped.
  • Published apps are served from https://<name>.onplana.app, and Free apps carry a small “Made with Onplana” badge.
  • Premium hosting removes the badge and exempts the app from the published-apps cap. It renews from the prepaid credit wallet; a wallet that cannot cover a renewal gets a grace period before the app returns to the free tier or unpublishes.
  • Onplana Maker workspaces (the standalone builder at maker.onplana.com) get two free live-app slots.

Full detail, including size limits and how to report an abusive app: Publishing apps, limits, and reporting abuse.