Onplana Tasks is a lightweight browser companion. It lives in your toolbar and shows the work assigned to you across every project, so you can check what’s due, add a task in plain language, tick things off, and capture any web page as a task, without opening the full app.

It’s a companion, not a replacement: the heavy planning (Gantt, dependencies, governance) stays in the web app, one click away.

Each browser has its own store, so install from the one you actually use. The extension is the same either way.

  1. Open the Onplana Tasks listing on the Chrome Web Store.

  2. Click Add to Chrome, then confirm Add extension.

  3. Pin Onplana Tasks to your toolbar (click the puzzle-piece icon, then the pin) so it’s always one click away.

Edge has its own listing on Edge Add-ons. Open it in Edge and click Get. Edge can also install from the Chrome Web Store, but the Edge listing is the one to use if you are on Edge, because it updates on its own schedule.

Everything on this page behaves the same in Edge as it does in Chrome.

Firefox installs from addons.mozilla.org, not the Chrome Web Store, and behaves the same as Chrome once installed.

Safari is the one that works differently, and it is worth knowing why before you start: Safari extensions ship inside a Mac app, so you install an app from the Mac App Store and it adds the extension to Safari.

Safari 16.4 or later on macOS 13 Ventura or later.

  1. Install Onplana Tasks for Safari from the Mac App Store.

  2. Open the app once. It has a single button, Quit and Open Safari Settings, which takes you where you need to go. The app’s whole job is to put the extension into Safari, so there is nothing else in it.

  3. In Safari → Settings → Extensions, tick Onplana Tasks to turn it on.

  4. Click the toolbar icon and choose Sign in with Onplana. Safari asks for permission the first time. Choose Always Allow.

Click the toolbar icon and choose Sign in with Onplana. A secure Onplana window opens for you to approve access, then the popup switches to your task list. You stay signed in to your workspace; the extension only receives a scoped access token, never your password.

The token is bound to the organization you’re signed into on the web. To use a different workspace, switch it in the web app, then sign in again from the extension.

You can use the extension before you have an Onplana account. Signed out, the popup opens on a task list kept in this browser. Add tasks in plain language, capture a page as a task, complete and snooze them, change their priority and due date, and pin them to My Day. Until you sign in, the extension makes no network requests at all.

Your tasks are stored only in this browser. Removing the extension deletes them. To keep a copy, open Settings with the gear at the bottom of the popup. On this device has Copy all, which puts every task on the clipboard, one per line, and Clear local tasks, which deletes them after asking. In Chrome and Edge, Download CSV saves them as a file that opens in Excel or Google Sheets. Onplana’s spreadsheet import reads each task’s title, due date and notes from it, but not its priority or whether it is done.

Projects, agents, issues, ideas and the inbox need an account, so they appear once you sign in.

When you sign in, the extension offers to move your tasks into Onplana: choose the tasks and a project, or let it create a project called My tasks for you. If you already own an open project called My tasks, they go there. The moved tasks are assigned to you, and anyone who can see that project can see them. They leave this browser once they are in Onplana, and you can undo the move for 10 minutes while the popup stays open. Completed tasks stay in this browser. Choose Keep on this device to leave them where they are; Move to Onplana in Settings brings the offer back.

The popup groups the tasks assigned to you into Overdue, Today, This week, and Later, newest and most urgent first. Click the circle to the left of a task to complete it; Onplana rolls the change up to the parent task automatically. Click Undo on a completed task to reopen it.

Pick a project in the popup’s project list, which reads All projects until you choose one, to see its tasks.

  • Mine or Everyone: Mine shows the tasks assigned to you and Everyone the whole project, each with its count. A project opens on Mine when you have open tasks assigned to you there, and on Everyone when you have none. Your pick is remembered for that project in this browser. An empty Mine offers Show everyone’s (N).
  • Open a task that Mine would hide, from the Inbox or search, and the project shows Everyone for that visit only, so the task is in the list.
  • Sort by Due date (the default, grouped by when tasks are due), Priority, Title, Newest created or Last modified. Every order but Due date is one list without groups. The choice is remembered in this browser for every project.
  • Dates opens a second row that narrows the list to tasks created or modified Today, in the Last 7 days or the Last 30 days. Any time turns it off. A dot on Dates means a date filter is on.

Type a task in the add bar and press Enter. Write it the way you’d say it, for example call Bob tomorrow or send the report friday: the extension reads the date and priority off your wording, on your device. Pick the target project from the to menu once, the extension remembers it.

On any page, click This page in the popup, or right-click and choose Add to Onplana. The extension creates a task in your chosen project with the page title, its link, and any text you selected, so you can act on it later without losing the source.

Click a task’s title to open its detail view without leaving the popup. From there you can edit the title, due date, and description, tick off its subtasks, reassign it to a teammate (or hand it to an agent), and read or add comments. Deeper structure, dependencies, custom fields, still lives in the web app, one click away via Open in Onplana.

Attached images show as thumbnails; select one to open it full size in the popup, so a screenshot someone attached is readable without leaving the extension.

When the popup shows one project, Open in Onplana beside its name opens that project in the web app, where its Gantt chart is one of the project’s tabs. It opens in the workspace the extension is signed in to, even when your browser has a different workspace open.

If you own a project or are one of its project managers, Invite appears beside the project’s name when the popup shows that project. Type one or more email addresses, one per line or separated by commas. Someone new joins your workspace as a guest and the project as a member; guests can be given tasks, complete them and log time. Someone already in your workspace is added to the project straight away. To make someone a full member of the workspace, invite them from the web app.

Inviting someone new can use a seat on your plan. If it would add a paid seat, people who can invite members to the workspace (Owners, Admins and Portfolio Managers by default) add it straight away; for anyone else, a workspace Owner or Admin is asked first. The extension tells you what happened to each address. Invite is hidden while you are offline.

People who can see every project in the workspace but aren’t on this one see Invite from the web instead, which opens the project in Onplana.

Give a task to someone who hasn’t joined

Section titled “Give a task to someone who hasn’t joined”

In a task assigned to you, the assign control offers Invite someone new. If they are already in your workspace, the task is theirs at once. If they are new, the task stays with you until they accept, then moves to them, and the task shows who it is waiting for. If you give it to someone else in the meantime, or they haven’t accepted within 30 days, it stays where it is.

When you can’t use it, Invite someone new is greyed out and says why when you point at it: only the project’s owner or a manager can invite people, and only to a task that is assigned to you.

If your workspace uses time tracking, open a task and choose Log time. Enter the hours (1.5, 1,5 and 1:30 all work), pick the day, which starts on today and cannot be a future day, and add a note if you like. Your week shows the week grouped by day, each day’s total, and the week’s total last.

  • One entry per task per day. Log time on a task you already logged that day and the app shows the entry that is already there, with Edit that entry, so you change it rather than add a second.
  • Drafts can be edited or deleted. If your workspace approves timesheets, Submit sends the week’s drafts for review, and Take back returns anything still waiting for review. An approved entry cannot be changed here.
  • Returned entries show why your approver sent them back. Edit one and it becomes a draft again, ready to resend.
  • You log your own time only. The Time row is hidden while the popup is showing a saved copy of your list offline, since an entry needs a connection.

No Time row? It only appears when your workspace includes time tracking and your copy of the app is up to date. If it asks you to reconnect, this device was connected before time entry was available, so sign out and sign in again. See Log and submit timesheets for plans and approvals.

If your workspace uses Onplana Services, the add box has a 🧾 button. Type what the expense was for and select 🧾: the expense form opens with your text as the description. Choose the project, fill in the Amount (42.50 and 42,50 both work; leave out thousands separators), check the Currency, which starts on the project’s own, pick a Category and the Date, and select Log expense. Your expenses at the top of the form opens your list without filing anything.

After you log one, the popup shows Your expenses, grouped by what needs doing: returned to you, drafts, waiting for approval, approved. Each group shows a subtotal per currency, never one figure across currencies.

  • A new claim is saved as a Draft. Submit sends it for approval, and Take back returns one that is still waiting.
  • Returned claims show why your approver sent them back. Resend sends one again.
  • Approved claims can’t be changed.
  • Filing needs a connection. While the popup is showing a saved copy of your list offline, the form says so and won’t file. Nothing is queued to send later, because a claim sent twice is a double charge somebody has to catch.

No 🧾 button? It only appears in workspaces with Onplana Services, and in version 1.6.0 or later of the extension. See Track rebillable expenses for approvals and how claims reach the margin report.

Hit a bug while you’re on a page? Right-click and choose Log an issue about this page, or open the Issues view and use Capture page. Onplana files an issue with the page’s title and link so you can report it the instant you see it, then triage severity and status later. The Issues view lists the issues you reported or own and lets you move them through their lifecycle (investigating, blocked, resolved).

Turn on My Day to narrow the list to what matters today, everything overdue or due today, plus anything you pin. Use a task’s menu to Add to My Day; pins reset automatically each morning so you start fresh.

Open the Inbox to see mentions, comments, and assignments on your work. When someone comments on a task you’re on, or @mentions you, the extension can raise a browser notification, so you hear about it even with the popup closed. Click a notification to jump straight to the task in Onplana.

On Safari the Inbox still lists everything; only the notification is missing.

If you have agents working in Onplana, the Agents button in the popup header opens a view of what they are doing, so you do not have to open the web app to find out whether one of them is waiting on you.

Work that needs you is always at the top, whatever else you have filtered or searched for. That is the point of the view: an agent that is blocked has stopped, and every minute it stays blocked is a minute it is not working.

Filter with the chips along the top:

  • Active what is in flight right now
  • Needs you blocked, waiting on a person
  • Running working, nothing needed from you
  • Done finished
  • All everything, including older work

Each chip carries its own count, and you can narrow further with the search box and the project picker. Rows are read-only here; select one to open the task in Onplana, which is where you reply, unblock or reassign.

Turn on Remind me about today’s tasks at the bottom of the popup for a once-a-day nudge when something is due or overdue.

The extension talks to Onplana over the same secure surface as the desktop and mobile apps. The access it holds covers your tasks, your project list, and your own time entries, nothing else: it cannot reach documents, wikis, reports, billing, or other people’s time. Sign out from the popup at any time to revoke the extension’s access on that device, or sign it out from Settings → Connections → Your Onplana apps in the web app.