Plan work in phases
Architecture and engineering practices plan and bill by phase: the brief, the concept, the coordinated design, the technical design, construction. The phases up to the technical design end with the client approving them, and that approval is the moment the phase’s fee becomes invoiceable and its scope stops changing for free; construction is billed against its completion instead. Onplana models a phase as an epic, each sign-off or completion point as a milestone, and each fee share as a milestone line on the quote linked to one of those milestones, so the programme, the fee schedule and the hours are one record.
Start from a phase template
Section titled “Start from a phase template”Three built-in templates lay a building project out this way. All three are available on every plan, and on every plan the project’s phases show as groups in the task list and as a filter on the Gantt. Adding, renaming or reordering a phase, and moving a task from one phase to another, are part of epics, on Professional and up.
| Template | Phases | What it carries |
|---|---|---|
| RIBA Plan of Work (Architecture) | Stages 0 to 7 of the 2020 Plan of Work | 22 tasks with hours, a client sign-off task and milestone closing each of Stages 1 to 4, three risks |
| AIA Design Phases (Architecture, US) | Schematic design, design development, construction documents, bidding, construction administration | 17 tasks with hours, an owner approval closing each of the three design phases, the customary 15/20/40/5/20 fee split named in the copy |
| Construction Documents and Closeout | Construction documents issue, preconstruction, construction administration, substantial completion, closeout documents, final completion and payment | 18 tasks with hours, five milestones from the issued documents to the project closed out, three risks |
The RIBA and AIA templates run the whole appointment. Construction Documents and Closeout starts where the drawings are issued and goes deep on the part the other two cover in a task or two: submittals and RFIs, the punch list, the closeout documents, retainage and final payment, and the 11-month warranty walkthrough. In RIBA terms it covers Stages 5 and 6. See the construction closeout template on onplana.com.
- From the sidebar, open Projects and select New Project.
- Name the project, then pick the template in the Template picker, under Built-in templates, and select Create Project.
- The project opens with one epic per stage, the tasks inside them, and the milestones on the Gantt chart as diamonds.
The durations and hours are a starting shape for a mid-sized project. Resize them once the appointment is agreed; the structure is what the template is for.
What a phase is in Onplana
Section titled “What a phase is in Onplana”A phase is an epic: a named, coloured group that tasks belong to, in order. Renaming a stage is renaming the epic; adding a stage is adding an epic and moving tasks into it (both on Professional and up). The task list can be grouped by epic, with the number of tasks in each group, and the Gantt filtered by it, on every plan. Because a timesheet hour is logged against a task, every hour belongs to the phase its task is in.
Each sign-off is a milestone, and so are the points the later stages close on: practical completion and handover in RIBA (Stages 0 and 7 carry none), contract award and substantial and final completion in AIA. A milestone has a date, it shows on the Gantt, and it can be linked to a milestone line on the quote, which is how a fee share is recognised.
Quote the fee per stage
Section titled “Quote the fee per stage”On the deal, price the engagement as milestone lines, one per fee share, each against one of the template’s milestones: in RIBA the Stage 1 to 4 sign-offs, then practical completion and handover; in AIA the three owner approvals, then contract award and the two completions. Send the quote for the client to accept. When the deal is won, the lines become the project’s milestone schedule, and each amount is recognised as revenue when its linked milestone completes. The stage’s fee then reaches the margin report in the period its milestone was completed, beside the project’s approved hours and cost.
The RIBA appointment leaves the split to the practice; Stages 2 to 5 usually carry most of it. The AIA tradition has a customary split of 15% schematic design, 20% design development, 40% construction documents, 5% bidding and 20% construction administration. Both are starting points, not rules. See Choose a billing model for how milestone amounts are recognised and Quote and win for the quote itself.
Read a phase from its tasks
Section titled “Read a phase from its tasks”Hours land on tasks, and tasks belong to epics, so the hours a phase has used are the approved hours on the tasks inside it. Group the task list by epic, or filter the Gantt by it, to see a phase’s tasks with their estimates and progress. Onplana does not total a phase’s estimate, hours or progress for you yet, so comparing a phase with its fee share is a sum you make from its tasks.
Migrated schedules
Section titled “Migrated schedules”A schedule imported from Microsoft Project arrives with its stages as summary tasks rather than epics, with dependencies and costs intact. Use the templates for new appointments; an imported plan keeps its own structure, and the phase cut, when it lands, will read summary tasks as phases on projects that have no epics.
Change after a sign-off
Section titled “Change after a sign-off”A client change after a stage sign-off is the most common source of unbilled design hours. File the ask against the client, decide whether it is in scope, and if it is not, add a line to the quote and send it again. The client’s requests view shows which asks became work without being re-priced. See Run your pipeline.