Build an app with Onplana Maker
Onplana Maker is the standalone app builder built on
Onplana. You describe the app you want in plain language, an agent writes it and
runs it live in a secure sandbox, and one click publishes it to a shareable
onplana.app URL. Unlike a bare chat-window builder, every Maker app sits on a
real Onplana project, with a plan, an issue log, and a files area.
Maker is usage-based: free credit to start, and one credit wallet that builds and AI edits draw from (the Free plan is also capped at 25 builds a day). Hosting your published apps is included. There are no seats and no subscription required.
Create your first app
Section titled “Create your first app”-
Sign up at maker.onplana.com. Email and password or Google / Microsoft sign-in both work. If you already belong to Onplana workspaces, Maker offers them first, use a workspace you already belong to or create a separate one just for Maker. Your apps and credits live in whichever workspace you pick and are visible to its members, so a personal workspace is the right call for personal projects. (Workspaces where you’re a guest aren’t offered, guests can’t create projects.)
-
Click New project and pick a path:
- Describe an app, the agent builds it right away. You land in the Build view with your description pre-filled.
- Start with a plan, AI drafts the project steps first, and you build later (or never; some projects stay plans).
-
In Build, describe what you want or pick a starter, then press Build it. The agent writes the app and runs it live in the preview.
Have a design in mind? Paste or drag a screenshot straight into the box (or use the paperclip), and the agent builds to match it, “make it look like this”. You can attach a few images per build; they show in your Files tab and guide the build without being shipped inside the app itself.
-
Keep talking to refine it: change the colors, make it work on phones, add a feature. Tick Make it better when a change deserves a deeper build. A build costs the tokens it actually uses, so a deeper build usually costs more.
-
When you are happy, follow Go live. Your app publishes to
https://<name>.onplana.app, a real URL you can share with anyone. You can roll back to an earlier published version at any time.
The project around your app
Section titled “The project around your app”Every Maker project has five views:
| View | What it holds |
|---|---|
| Build | The agent, the live preview, and the publish controls. |
| Plan | A living to-do list. Agreed build steps become checkable items, and the agent ticks off its own work. You can rename, reorder, add steps and substeps, and send any step straight to Build with one click. |
| Issues | Problems the agent hits during a build land here instead of vanishing into chat history. |
| Files | Briefs, assets, and reference docs that stay with the project. |
| Submissions | What your published app has collected. If your app has a form, every submission lands in a list you can open here, with its received time, and export to Excel. Read-only by design, editing and deeper list work live in the full Onplana app, and the export covers everything the view doesn’t show. |
Credits, publishing, and hosting
Section titled “Credits, publishing, and hosting”- You start with included AI credit, and every build draws the tokens it uses from your credit wallet; top up from $5 on the Billing page. The Free plan is additionally capped at 25 builds a day. Purchased credit is valid for 90 days and is spent before your included credit; credit you earn (referrals and rewards) never expires.
- Publishing and hosting are included. Apps published from a Free-plan workspace carry a small “Made with Onplana” badge; any paid plan removes it on the next publish. See Publishing apps, limits, and reporting abuse for the live-app limits.
- The Billing page also has a Get free credit section, share Onplana or follow along on social platforms and claim a small credit reward for each.
When your app becomes a team effort
Section titled “When your app becomes a team effort”Maker projects are real Onplana projects. Choose Open in Onplana (from the account menu, or a project’s overflow menu) and the same project opens in the full Onplana workspace, already signed in, with people, timelines, and every other Onplana capability available. Nothing to migrate.
Is Maker a separate account from Onplana? No. It is the same account and the same platform, Maker is a focused surface over it. A Maker workspace appears as an organization in the full app.
Do I need to know how to code? No. You describe what you want; the agent writes and runs the code. If you do want the code, you can export it from the Build view.
What happens when I run out of credit? Top up the wallet from $5, claim the free-credit rewards on the Billing page, or upgrade your Onplana plan for a much larger included credit and no daily cap.
Can I show the agent a screenshot or a design? Yes. Paste an image into the Build box, drag it in, or use the paperclip. The agent looks at it and builds to match, great for “recreate this UI” or “match these colors”. Attached images live in your Files tab as design references and are never shipped into the published app.
Can my whole team use a Maker project? Open it in the full Onplana workspace, that is where teammates, roles, and collaboration live. Maker itself stays a solo, focused building surface.
Related
Section titled “Related”Was this helpful?
Thanks for your feedback!