Skip to content

Try Professional for 14 days

All plansOwner

Free workspaces can run Onplana Professional for 14 days at no cost. There is no card to enter and nothing to cancel: the workspace returns to Free by itself when the window closes, and everything you made in the meantime stays where it is.

Each workspace can do this once, ever.

Everything in Professional, for the whole workspace:

  • Sprints and agile boards
  • Resource capacity planning
  • Timesheets and time tracking
  • Automations on tasks and projects
  • Project templates
  • Custom fields and custom dashboards
  • Intake forms for project requests
  • Whiteboards and pages
  • Role permissions you can tailor in the permissions matrix
  • Advanced AI: risk detection, Suggest schedule on the Gantt and the AI insight when you level resources
  • Schedule risk: the Monte Carlo run that gives the P50 and P80 finish, on the web and in Onplana Schedule

Professional’s limits apply too: up to 100 members, 200 projects and 50 GB of storage, against Free’s 5 members, 2 projects and 300 MB.

The offer comes to you at the moment it is useful. When someone in a Free workspace opens a Professional feature, sprints for example, the lock on that screen offers the trial. The note on a locked control offers it too, such as the one in Project Templates that says templates need Professional. It also appears in Organization Settings → Billing.

At the project limit. Free has room for 2 projects. When you try to create a third, the New Project dialog says you are at the limit and offers the trial in the same place, because Professional’s limit is 200 projects.

A member who is not on a project yet does not reach that dialog: the Dashboard and the Projects page show one card instead, You are not on a project yet, with This workspace is at its project limit. and Ask name to upgrade, and New Project is greyed out with that reason. Owners, Admins and Portfolio Managers, who see every project by default, keep the dialog and the trial.

At the member limit. Free has room for 5 members. When you invite a sixth person, the invite dialog says the member limit is reached and offers the trial beside Upgrade the plan. Once the trial starts, the invitation goes through, because Professional’s limit is 100 members.

At the storage limit. Free has room for 300 MB of files. When the workspace passes 80% of it, Owners and Admins see a storage banner that offers the trial beside the Billing link. If an upload is refused because storage is full, the upload says so in words and the banner shows the same offer, because Professional’s limit is 50 GB.

From Onplana Schedule. In the desktop app, the lock on a Pro command such as Set baseline, and the result after you publish a plan to a Free workspace, offer the trial. An Owner with a verified email starts it there with Try Pro free for 14 days; see Try Pro free in Onplana Schedule.

From the Onplana website. Pressing Start Pro trial on onplana.com (on the home page, the pricing page or the button at the top of every page) and then signing up starts the 14-day trial on sign-up, with no second confirmation, and you land on the step that creates your first project. A solo sign-up on a personal email address qualifies too. If your email is not verified yet, Onplana says so, and the trial starts once you verify it.

From ChatGPT or Claude. If you create projects through the Onplana connector and reach the limit, the assistant can pass on a link to the trial. The same happens when Claude, ChatGPT or Codex asks for a Professional feature a Free workspace does not have, such as sprints, custom fields, automations or time tracking: the refusal offers the trial alongside the upgrade link. The link opens Billing in Onplana, where an Owner confirms the trial. Nothing starts from the chat itself.

From Microsoft Marketplace. The Professional plan on the Marketplace listing carries a 14-day free trial too. It works differently: Microsoft bills the subscription when the trial ends unless you cancel it first. See Buy Onplana through Microsoft Marketplace.

Only an Owner can start the trial, because it changes what the whole workspace is treated as. Anyone else who reaches a locked feature sees that an owner can start it, and sees the features appear once it starts.

A few workspaces never see the offer:

You will not see the offer if Why
You are already on a paid plan There is nothing to trial.
The workspace has had a trial before One per workspace, ever.
You have started a trial on another workspace One per person, so a new workspace is not a fresh trial.
You have paid for this workspace at any point Past customers upgrade rather than trial.
The owner’s email is not verified Verify it and the offer appears.
It is a Maker workspace Maker runs on build credits rather than plan tiers.
  1. As an Owner, open a Professional feature such as Sprints, try to create a project past Free’s limit, or go to Organization Settings → Billing.

  2. On a locked feature, select Try Professional free for 14 days. On the Billing tab, select Start free trial on the trial card.

  3. Confirm. Professional features unlock immediately for everyone in the workspace, and a banner shows how many days remain.

The 14 days start when you claim, not when you were first offered. If you are not ready, the offer waits.

Your billing stays Free. The trial is not a subscription, so there is no invoice, no proration and nothing to cancel. If you decide to buy, you upgrade normally and the trial simply stops mattering.

Onplana warns every Owner twice before the end, by email:

  • Four days before, the email says how many days are left, what the workspace did during the trial, and links to Billing. It may also carry a team code: 50% off your first 3 months of Professional when you buy 2 or more seats on monthly billing.
  • The day before, the email gives the end date and what changes on Free: Free’s project and member limits and the Professional features that switch off. It also says how long those features stay readable afterwards (30 days).

A workspace that buys a plan during the trial gets neither warning.

When the window closes, the workspace returns to Free on its own, and every Owner gets an email saying so. Nothing is deleted and nothing is billed. That email says how long Professional features stay readable, and that your projects, tasks and files stay on Free for as long as the workspace is in use. The trial banner may show the same team code in the last days.

Everything you created is kept: sprints, timesheets, templates, wiki pages, custom fields and their values all stay in place. Features that belong to Professional stop being editable, and the records they produced remain readable.

If the workspace grew past Free’s limits during the trial, nothing is removed. You keep the members and projects you have, and adding more waits until you are back within the limit or on a paid plan.

Nothing is required of you. Let the window close and the workspace carries on as a Free workspace with all of your work intact.