Run an architecture or engineering practice in Onplana
An architecture or engineering appointment is sold, planned and billed by stage. This article walks one appointment through Onplana from start to finish: the template it starts from, the sign-off that closes each stage, the fee per stage on the quote, and the hours that go into each stage. Each part links to the article that covers it in depth.
| Part | Where it lives | Plan |
|---|---|---|
| The RIBA, AIA and construction closeout templates | Projects, New Project | Every plan, Free included |
| Grouping the task list and filtering the Gantt by phase | The project | Every plan, Free included |
| Adding, renaming and reordering phases (epics), moving tasks between them | The project | Professional and up |
| Timesheets and approvals | Timesheets | Professional and up |
| Rate cards, cost rate and billable rate | Settings | Every plan |
| Clients, deals, quotes, fee per stage, client and project rates, margin, accounting export | Onplana Services | A Services workspace |
Clients, deals, quotes, billing terms and the margin report belong to Onplana Services, which is Onplana with the commercial layer added. A Services workspace on its paid plan carries everything in the table.
1. Start the appointment from a template
Section titled “1. Start the appointment from a template”Two built-in templates lay a whole building appointment out by stage, and a third goes deep on the end of it. Every task in all three carries estimated hours, and each stage is a phase (an epic) with the tasks for that stage inside it.
| Template | Stages | What it carries |
|---|---|---|
| RIBA Plan of Work (Architecture) | Stages 0 to 7 of the 2020 Plan of Work | 22 tasks with hours, six milestones (the Stage 1 to 4 client sign-offs, practical completion, handover), three risks |
| AIA Design Phases (Architecture, US) | Schematic design, design development, construction documents, bidding and negotiation, construction administration | 17 tasks with hours, six milestones (the three owner approvals, contract awarded, substantial completion, final completion), three risks |
| Construction Documents and Closeout | Construction documents issue, preconstruction, construction administration, substantial completion, closeout documents, final completion and payment | 18 tasks with hours, five milestones (construction documents issued, construction start, substantial completion, final completion, project closed out), three risks |
The RIBA and AIA templates run the whole appointment and cover construction in a task or two. Construction Documents and Closeout starts where the drawings are issued and breaks the rest out: submittals and RFIs, field reports, pay applications and change orders, the punch list, the O&M manuals and record drawings, lien waivers and the consent of surety, final payment and the release of retainage, and scheduling the 11-month warranty walkthrough. It uses US terms; in RIBA terms it covers Stages 5 and 6. Use it on its own for a construction-phase appointment, or as a second project after a RIBA or AIA design project. The construction closeout template page on onplana.com shows it in full.
- From the sidebar, open Projects and select New Project.
- Name the project after the appointment, then in the Template picker, under Built-in templates, choose RIBA Plan of Work (Architecture), AIA Design Phases (Architecture, US) or Construction Documents and Closeout. The dialog previews the template’s tasks, milestones and phases before anything is created.
- Select Create Project. The project opens with one phase per stage, the tasks inside each, and the milestones on the Gantt as diamonds. A project from a built-in template starts today.
- Resize the durations and hours to the appointment you agreed. They are a starting shape for a mid-sized project, not a rule.
On Professional and up, rename a stage if your appointment uses other words, add one (pre-design, or a separately priced Stage 0), or drop one you are not appointed for. The stage names are yours; the product’s own labels around them still say Epic.
Plan work in phases covers what a phase is in Onplana and how imported Microsoft Project schedules differ.
2. Treat each sign-off as the end of a stage
Section titled “2. Treat each sign-off as the end of a stage”In the RIBA and AIA templates the briefing and design stages end with a short sign-off task and a milestone: the client sign-off at the end of each of RIBA Stages 1 to 4, and the owner approval at the end of each of the three AIA design phases. The later stages close on contract award, completion or handover instead. The construction closeout template has no design sign-offs; its milestones are the issue of the construction documents, the start of construction, substantial completion, final completion and the project closed out.
The sign-off milestone does two jobs. It is the date on the programme the client is working to, and it is the point that recognises the stage’s fee (step 3). Complete it on the day the client actually signs, not the day the drawings went out, so the fee lands in the right period.
3. Quote a fee per stage
Section titled “3. Quote a fee per stage”The fee per stage is a milestone schedule on the deal. Each stage’s share of the fee is one milestone line, linked to one of the template’s milestones.
- On the Pipeline, open the deal for the appointment and set How this will bill to Milestones.
- Add a milestone line for each fee share and link each to its milestone: in RIBA, the Stage 1 to 4 sign-offs, then practical completion and handover; in AIA, the three owner approvals, then contract awarded and the two completions; in the construction closeout template, substantial completion, final completion and project closed out.
- Add any hourly work or expenses as their own lines on the same quote. A quote carries one kind of fee, so a milestone quote can sit beside time and expense lines but not beside a fixed fee or a retainer.
- Send the quote. The client opens it on a private link and accepts it.
- Win the deal. The project it creates carries the lines as its milestone schedule.
From then on, each amount is recognised as revenue when its linked milestone completes, and the margin report shows it for that period beside the cost of the project’s approved hours. An amount that is not linked to a milestone is never recognised, and the report names it, so link every line.
The RIBA appointment leaves the split to the practice. The AIA tradition has a customary split of 15% schematic design, 20% design development, 40% construction documents, 5% bidding and 20% construction administration, which the AIA template names in its task notes. Both are starting points: the lines on the quote carry whatever your appointment says.
See Choose a billing model for how milestone amounts are recognised and Quote a deal and get it accepted for the quote itself.
4. Log and approve the hours inside each stage
Section titled “4. Log and approve the hours inside each stage”Time is logged against a task, and every task belongs to a stage, so each hour is recorded against the stage it was spent on.
- Each person logs time on the tasks they worked, from the timesheet, the task itself or one of the Onplana Tasks apps. See Log and submit timesheets.
- At the end of the week they submit it, and it goes to their approver.
- The approver approves or rejects the week. Only approved hours count toward cost and margin. See Approve timesheets.
Hours are priced twice: at each person’s cost rate for what the stage costs you, and at the billable rate for anything you bill by the hour. Rate cards hold both. A rate agreed for one client or one project, as a billable rate or a markup on cost, goes on that client or project. See Set client and project rates.
5. Read a stage against its fee
Section titled “5. Read a stage against its fee”Group the project’s task list by phase, or filter the Gantt by it, to see a stage’s tasks with their estimates and progress. The group heading shows how many tasks the stage holds.
What Onplana does not do
Section titled “What Onplana does not do”- It does not invoice and it does not post to your general ledger. Invoice numbering, tax, credit notes, receivables and payment stay in your accounting system. At the end of a period, accounting export sends the approved time, expenses and recognised stage fees to Xero as draft invoices or to QuickBooks Online as invoices, one per client, or to a CSV file for any other system.
- It does not bill part of a stage. A stage fee is a milestone amount, and a milestone amount is recognised whole when its milestone completes. Billing a share of a stage because it is partly done is not built.
- It does not yet report profit by stage, as the caution above says.
We already plan in Microsoft Project. Do we have to start again? No. Import the schedule and it arrives with its tasks, dependencies, resources and costs; a .mpp or Project XML file imported into a new project brings its baseline too. Its stages arrive as summary tasks rather than as phases, which is how Microsoft Project holds them. Use the templates for new appointments.
Do engineers on the project need their own seat? Anyone who logs time needs to be a member of the workspace, either a seat or a guest within your plan’s guest allowance. A guest logs time and expenses on the projects they are invited to.
Can one practice use more than one template? Yes. Each project starts from whichever template its appointment follows, and the client, quote and margin work the same way for all three.